Maanvi Ecotech provides industrial water audits and water-efficiency engineering services designed to improve visibility of consumption, identify avoidable losses and support technically and economically appropriate improvements. Depending on the engagement, services can extend from field assessment to implementation management and post-project verification.

Industrial premises

Audit-to-implementation for industrial facilities

From pre-audit surveys and flow measurement to water balances, recommendations, project implementation and performance verification, we connect technical analysis with measurable action.

Pre-Audit SurveyMeter Assessment & Ultrasonic Flow MeasurementWater BalanceRecommendationsImplementation RoadmapRe-Engineering & Project ManagementPerformance Verification
Request an industrial water audit

Company and contact details; facility location and sector; water sources; approximate consumption; major treatment systems; audit objective; preferred consultation date. Optional: water bills, drawings or preliminary analyses.

The eight-stage service journey
StageOfferingTypical output
01Pre-Audit Survey & Initial AssessmentSurvey report and measurement plan
02Meter Verification & Ultrasonic MeasurementMeter register and flow measurement findings
03Detailed Audit & Water BalanceReconciled water-balance and opportunity register
04Engineering RecommendationsPrioritised short- and long-term solutions
05Time-Bound Implementation RoadmapActions, owners, schedule and decision gates
06Re-Engineering & Technical SolutionsConcepts, specifications and defined engineering scope
07Project Management & Execution SupportProcurement/installation/commissioning coordination
08Performance VerificationPre/post comparison against a defined baseline
STAGE 01

Pre-Audit Survey & Initial Water Assessment

A structured pre-audit survey maps the plant’s water infrastructure, establishes the available consumption baseline and identifies the measurements needed for a meaningful detailed audit.

Scope of work
  • Identify water sources, receiving arrangements, storage, pumping and distribution networks.
  • Review treatment systems, significant consumers, process utilities, reuse and wastewater handling.
  • Inventory installed meters, operational records, water bills and available flow drawings.
  • Identify preliminary leakage, overflow, excess discharge, unusual consumption and measurement gaps.
  • Plan field measurements, ultrasonic meter locations, access requirements and monitoring periods.
Deliverables
  • Facility water-system inventory and preliminary flow schematic.
  • Major consumer and meter inventory with data gaps.
  • Available baseline-data summary and preliminary findings.
  • Recommended ultrasonic measurement locations and detailed audit plan.
  1. STEP 1Preliminary discussion
  2. STEP 2Site walkthrough
  3. STEP 3Infrastructure & metering review
  4. STEP 4Initial water-flow map
  5. STEP 5Detailed audit plan

Initial flow mapping is not a verified water balance; detailed field measurements and reconciliation follow in the next stages.

STAGE 02

Meter Assessment, Verification & Ultrasonic Flow Measurement

Reliable metering is central to establishing plant-wide and process-level water balances. Maanvi Ecotech assesses existing instruments and, where appropriate, uses temporary clamp-on ultrasonic measurements or recommends permanent flowmeter upgrades to improve confidence in water-consumption data.

Meter assessment
  • Create meter register covering tag, location, service, pipe size, meter type, reading units and maintenance status.
  • Check installation against manufacturer requirements: straight-run availability, flow direction, accessibility, full-pipe conditions and other applicable factors.
  • Review meter range, signal condition, calibration/verification documentation, observed anomalies and record-keeping.
  • Compare with reference measurements where feasible; classify meters as usable, requiring investigation or needing replacement.
Ultrasonic flow measurement
  • Assess feasibility of clamp-on measurement for pipe material, wall thickness, lining, fluid, fouling and acoustic conditions.
  • Select temporary monitoring points, measurement durations and operating modes (normal, peak, intermittent and shift-based).
  • Record instrument configuration, installation assumptions, readings, timestamps and relevant plant operating status.
  • Recommend permanent ultrasonic or other meter technologies, including suitable access, communication and data-logging arrangements.
Outputs and limitations

Outputs: meter-health register; measurement-point plan; field flow measurement records; confidence/uncertainty notes; proposed permanent metering architecture and priority actions. Comparisons represent field verification under stated conditions, not accredited calibration unless separately arranged. Measurement performance depends on the instrument, site access, flow profile, pipe conditions, acoustic coupling and available installation length.

03

Detailed Water Audit & Water Balance

Measure and reconcile significant inflows, consumption, treatment rejects, recycle streams and discharges; identify opportunities and constraints.

04

Short- and Long-Term Recommendations

Separate immediate operational fixes from engineered modifications; assess feasibility, expected benefits and water-quality implications.

05

Time-Bound Implementation Planning

Prioritise actions by impact, cost, operational constraints and implementation readiness; propose milestones and accountabilities.

06

Re-Engineering & Technical Solutions

Develop application-specific modifications, process concepts, equipment specifications and technical evaluation packages.

07

Project Management & Execution Support

Provide agreed technical procurement, installation coordination, commissioning support and project monitoring.

08

Post-Implementation Verification

Compare results against documented baselines at equivalent operating conditions, including water quality, recovery, cost and resource use.

What the customer receives

Discover → Diagnose → Decide → Deliver → Demonstrate

01

Discover

Clear map of the water network and measurement gaps.

02

Diagnose

Evidence-led assessment of usage, losses and improvement opportunities.

03

Decide

Prioritised technical solutions with cost, feasibility and time considerations.

04

Deliver

Defined implementation engineering and project-management support.

05

Demonstrate

Documented before/after performance review and future monitoring framework.

Good to know

How we scope and report

  • The scope of site visits, metering, measurements, engineering, procurement, implementation and verification is defined in an accepted proposal.
  • Observed readings and field meter checks are not presented as accredited meter calibration unless carried out through an appropriately qualified service.
  • Estimated water, energy and chemical savings are identified as projections until substantiated by agreed verification methods.
  • Water reuse and treatment changes must protect product-water quality and applicable site and environmental requirements.
  • Temporary or permanent meter installations are subject to safety, access, acoustic and process constraints; client approvals may be necessary.